Project Location Cold Creek near 302nd Street and 8 Ave
Project Description A sequence of projects to reduce upstream erosion, install grade controls and stabilization downstream, and replace the pipe or reopen the stream channel near the Marine Hills pool.
Public Benefit
- Reduced erosion
- Reduced flooding
Project Cost $3,800,000
Project Type SWM
Timeline 2020-2023
 
Related Documents: